Location
Type
Area
COnstruction time
From one existing home to three individually designed, two-storey townhouses.
This 746m² property in Cloverdale has been transformed into a contemporary residential development, combining practical layouts, high-end finishes and a considered approach to multi-unit construction.
The brief
This was a single residential property at 151 Williamson Avenue, Cloverdale, that a private property investor wanted to transform into three individually designed townhouses.
The project involved the demolition of the original house and construction of three substantial, two-storey residences, each designed to balance functionality, contemporary style and long-term appeal.
Scope of Work
Mecca Constructions coordinated the development from the early planning stages, including site preparation and demolition, arranging building design, engineering and approvals through to construction and subdivision.
Construction commenced in May 2025, with all three two-storey townhouses completed in October 2026.
Rather than repeating the same floor plan three times, each residence was individually designed with its own layout, proportions and living spaces.
All three homes feature four bedrooms, a double garage, separate laundry, private alfresco and porch, with differences in internal living areas, bathrooms and additional spaces.
Considering a Townhouse or Triplex Development in Perth?
This Cloverdale project demonstrates how an existing residential site can be transformed into multiple modern homes through coordinated planning, design and construction.
If you own a property in Perth and are considering a knockdown and rebuild, duplex, triplex or multi-unit development, the first step is understanding what your site can realistically accommodate.
Every block is different. Zoning, access, site dimensions, servicing requirements and development approvals all influence what’s possible.
At Mecca Constructions, we take a practical approach to investor builds, helping you explore your options, understand the building process and make informed decisions before construction begins.
Have a block with development potential? Let’s talk about what’s possible.

